Project Description
At Bulgari Hotel & Resort we worked on a lot of different projects, a lot of them were general maintenance, but later on we were also contracted for woodworking as part of the major renovation of the whole resort 2016/2017. This project was under the general maintenance period and we replaced the old decking with reclaimed Ulin, repaired concrete and used a proper ulin sub floor. Finishing was done with a water based stain specially developed for Bulgari (Bulgari Red) and water based coating.