Project Description
Among many other works at Bisma 8 Hotel we also installed the lobby lounge flooring and wall using BONA R848 adhesive and BONA Prime with two top coats of Mega water based finish in Extra Matt.
Among many other works at Bisma 8 Hotel we also installed the lobby lounge flooring and wall using BONA R848 adhesive and BONA Prime with two top coats of Mega water based finish in Extra Matt.