As part of our contract at Bisma 8 Hotel we did install this stunning staircase using solid timber, glued down with BONA R848 adhesive and finished with BONA Mega waterborne coating
Bisma 8 Lobby Lounge
rose2017-05-02T10:12:57+08:00Among many other works at Bisma 8 Hotel we also installed the lobby lounge flooring and wall using BONA R848 adhesive and BONA Prime with two top coats of Mega water based finish in Extra Matt.
Bisma 8 Rooms
rose2017-05-02T10:51:31+08:00We installed wooden flooring in all 38 rooms using BONA R848 silane based adhesive and BONA water based Prime with one top coat of Mega Extra Matt finishing