Bulgari Villa 12 was still under the general maintenance program, we removed the existing flooring and deckinga nd sub floor and repaired concrete and installed sub floor with ulin joists. Afterwards we installed flooring using Primatech Powernails and for the decking Tiger Claw Hidden Deck fasteners
Bulgari Gym
Saras2017-05-05T11:28:47+08:00At Bulgari Hotel & Resort we worked on a lot of different projects, a lot of them were general maintenance, but later on we were also contracted for woodworking as part of the major renovation of the whole resort 2016/2017. This project was under the general maintenance period and we replaced the old decking with [...]
Bulgari Villa 70
chris2017-05-05T11:37:28+08:00At Bulgari Hotel & Resort we do a lot of projects, one of them was a partial maintenance at the Presidential Villa replacing the 2nd floor decking, sanding and finishing. We also had to repair the concrete partially and install a proper ulin sub floor prior to installing the decking and finishing it with the [...]
Bulgari Shop
chris2017-05-05T11:36:39+08:00At Bulgari Hotel & Resort we worked on a lot of different projects, a lot of them were general maintenance, but later on we were also contracted for woodworking as part of the major renovation of the whole resort 2016/2017. This project was under the general maintenance period and we replaced the old decking with [...]